Five Points to Westside Transmission Line Rebuild Project

 

CPS Energy is planning to rebuild an existing single circuit 138 kV transmission line between the Westside and Five Points substations. The transmission line route will be approximately four miles long and begins near at the Westside Substation near the intersection of Ruiz St and San Joaquin Ave. The project will involve a complete rebuild of the transmission line including foundations, transmission structures (poles) and electrical wires. CPS Energy plans to replace the transmission line along the existing route.  However, there will be a change in the type of structures. The existing lattice (webbed) structures will be replaced with steel poles.

The project is scheduled for completion in June 2017.