CPS Energy’s offices, customer service centers and call center will be closed Monday, January 21 in observance of Martin Luther King Jr. Day.  During the closure, customers can report natural gas or electric emergencies by calling 210-353-HELP (4357) or 1-800-870-1006 24/7. Social media channels will be monitored for urgent issues.

Five Points to Westside Transmission Line Rebuild Project

 

CPS Energy is planning to rebuild an existing single circuit 138 kV transmission line between the Westside and Five Points substations. The transmission line route will be approximately four miles long and begins near at the Westside Substation near the intersection of Ruiz St and San Joaquin Ave. The project will involve a complete rebuild of the transmission line including foundations, transmission structures (poles) and electrical wires. CPS Energy plans to replace the transmission line along the existing route.  However, there will be a change in the type of structures. The existing lattice (webbed) structures will be replaced with steel poles.

The project is scheduled for completion in June 2017.

 For more information, contact:

CPS Energy
Kevin Phillips, Project Manager
Five Points to Westside Transmission Line Rebuild Project
Mail Code 111008
P.O. Box 1771
San Antonio, Texas 78296-1771
(210) 353-2923
ktphillips@cpsenergy.com