General Electric LM6000 Gas Turbine Engine Overhaul Services

Collective 7000153982

Description: Company shall provide General Electric (“GE”) LM6000 gas turbine engine overhaul services for the CPS Energy Milton B. Lee East and West power plants.

Solicitation Detail:

Company shall provide all labor, tools, equipment and machinery, parts and materials necessary to perform the following Services, on an as needed basis, and as requested by the CPS Energy Field Representative.          

Solicitation Documents:

Companies wishing to provide a Response for this Solicitation must download the Collective Document for this Solicitation no later than June 20, 2019 from the website. There is a link for the Collective Document located on the left side of this page, under the “Solicitation Documents.” To successfully download the documents, it is recommended that Google Chrome 33+, Mozilla Firefox 38.01.1, or Internet Explorer 9 or greater be used.

Pre-Solicitation Meeting:

A Mandatory Pre-Solicitation Meeting will be held on June 20, 2019 at 2:00 pm (Central). Leon Creek Power Station (Leon Creek Conference Room), 7718 Quintana Road San Antonio, Texas 78211.

Response Due Date:

Responses are due no later than July 8, 2019 at 2:00 p.m. (Central). CPS Energy reserves the right to reject late Submittals. The Collective Document contains all pertinent information regarding Responses.

Contact Name: Dolores Torres-Elizondo

Contact Email: dtelizondo@CPSEnergy.com