CPS Energy’s offices, customer service centers and call center will be closed Monday, January 21 in observance of Martin Luther King Jr. Day.  During the closure, customers can report natural gas or electric emergencies by calling 210-353-HELP (4357) or 1-800-870-1006 24/7. Social media channels will be monitored for urgent issues.

Solicitation Documents

 
Three (3) year contract for water treatment system and reverse osmosis water treatment services.

Collective 7000151641

Description: CPS Energy is interested in employing a Company to provide water treatment system and reverse osmosis water treatment services on an as needed basis.

Solicitation Detail:

Company shall provide CPS Energy inspections, maintenance and replacement of parts for the water treatment systems at CPS Energy facilities.               

Solicitation Documents:

Companies wishing to provide a Response for this Solicitation must download the Collective Document for this Solicitation no later than January 28, 2019 from the website. There is a link for the Collective Document located on the left side of this page, under the “Solicitation Documents.” To successfully download the documents, it is recommended that Google Chrome 33+, Mozilla Firefox 38.01.1, or Internet Explorer 9 or greater be used.

Pre-Solicitation Meeting:

A Mandatory Pre-Solicitation Meeting will be held on January 15, 2109 at 1:00 p.m. (Central) at 12940 U.S. HWY 181 S, San Antonio, Texas 78223. Please wear a long sleeve 100% cotton shirt, long pants and safety toe boots to the meeting.

Response Due Date:

Responses are due no later than January 30, 2019 at 3:00 p.m. (Central). CPS Energy reserves the right to reject late Submittals. The Collective Document contains all pertinent information regarding Responses.

Contact Name: Rosalinda Ramirez

Contact Email: mrramirez@cpsenergy.com