System Maintenance: Today Saturday, November 23, 2024, from 11:00PM to Sunday, November 24 at 7:00AM, our EZ Pay credit card payment processing may not be available; however, you may make a payment by logging in to Manage My Account. You may report an outage online or by calling (210) 353-4357. Visibility to bills in Manage My Account may also not be available during this maintenance.
Howard Road to Leon Creek Phase I Transmission Line Project
The Howard Road to Leon Creek Phase I Transmission Line Project consists of rebuilding approximately 3 miles of single circuit 138kV transmission line from the Howard Road Substation to the Leon Creek Substation. The project consists of completely removing and rebuilding the transmission line, foundations. Adding new transmission structures and electrical wires. The current lattice (webbed) structures will be replaced with steel monopoles.
Transmission line infrastructure consists of specially designed structures and wires that move electricity long distances at high voltages from station to station.
The reconstruction of the transmission line is necessary to support the accelerating growth in San Antonio. It will also increase the reliability of Texas’ electric grid by adding another path for electric transmission.
You may call, write, or email:
CPS Energy
Oscar Luevanos,
Project Manager
Howard Road to Leon Creek Transmission Line Project
Mail Code RT0801
500 McCullough Ave.
San Antonio, Texas 78215
(210) 353-4504
[email protected]