To maintain the overall health of our infrastructure and utility system. We have to occasionally close roads to perform upgrades. maintenance and replacements. The road closures below are scheduled but on occasion. we are forced to close roads to make unscheduled repairs to our equipment.
The below schedule and timeline are subject to change. Thank you for your patience as we work to provide you with safe and reliable electric and gas service.
Date: Monday July 7, 2025, thru Tuesday morning July 8, 2025
- Time: 11:00 P.M. – 5:00 A.M.
- Location: Hwy 471 & FM 1283
- Zip Code: 78253
- Scope of Work: CPS Energy contractors and their crews will be installing and removing overhead primary wire crossing Hwy 471 & FM 1283.
- Traffic Control and Notifications: Blue Shield traffic control will be providing traffic control on the North and South bound side of Hwy 471 with 6 rolling traffic stops lasting up to 15 minutes, uniformed officers will be directing traffic.
- Outages: There will be no outages.
- The Traffic Control Plan has been approved by TxDOT