Howard Road to San Miguel Transmission Line Project
CCN Application Links
- Environmental Analysis
- Figure 2-4 Constraints(PDF, Map, 17MB)
- Figure 4-1 Inventory (PDF, Map, 12.3MB)
- Cost Estimates
- Need
- Directly Affected Landowner Map Overview(PDF, Map, 10MB)
- Landowner Notice Letter
- Carta de Notificación al Propietario
- Howard Road to San Miguel Segment Descriptions
- Howard Road to San Miguel Notice Map
- Guide for Landowners Affected by a New Electric Transmission Line Route
- Guía Para Propietarios Afectados por Una Nueva Ruta de Línea de Transmisión Eléctrica
- PUC Landowner Intervention Form
- PUC Landowner Protest Form
- Directly Affected Landowner List
- Public Official and Agency Notice Package
- Public Official and Agency Notice List
- Newspaper Notice
- Texas Parks and Wildlife Department Notice Letter
- Affidavits
References
The Howard Road to San Miguel Transmission Line Project involves the proposed construction of approximately 50 miles of transmission infrastructure traversing parts of Atascosa and Bexar Counties. This project will be completed with collaboration between CPS Energy and South Texas Electric Cooperative (STEC). The proposed transmission line project will connect the CPS Energy Howard Road station and STEC’s San Miguel station in Christine, TX
This project will increase the resiliency and reliability of Texas’ electric grid by adding another transmission pathway, while also adding support to the accelerating growth south of San Antonio.
Update 10-04-2024: CPS Energy and STEC have filed their Joint CCN Application for the Howard Road to San Miguel Transmission Line Project with the Public Utility Commission of Texas under docket number 57115. The filed application can be found on the PUC Interchange website here. Digital copies of the complete application and attachments are available on this website and the PUC Interchange. A physical copy of the documents is available for public viewing at:
CPS Energy, 500 McCullough, San Antonio, TX 78215
and
Jourdanton Library, 1101 Campbell Ave, Jourdanton, TX 78026
Notice packages (Attachment 6) for this project have been mailed out via first class mail to all directly affected Landowners. If you wish to participate in this proceeding by becoming an intervenor, the deadline for intervention in the proceeding is November 4, 2024, and the PUC should receive an electronic filing or letter from you requesting intervention by that date. More information about the PUC’s filing process can be obtained at the PUC’s website here. Instructions for using the PUC Filer are available here. For assistance with an electronic filing, please contact the PUC’s Help Desk at (512) 936-7100 or [email protected].
Update 9-17-2024: CPS Energy and STEC have filed for a docket number with the Public Utility Commission of Texas (PUC). The docket number is 57115 and can be found on the PUC Interchange website here.
You may call, write, or email:
CPS Energy
Antonio DeMendonca,
S&T Regulatory Support Project Manager
Howard to San Miguel Transmission Line Project
Mail Code RT0801
500 McCullough Ave.
San Antonio, Texas 78215
(210) 353-2018
[email protected]
STEC
Arthur H. (Holly) Gifford
Transmission Project Coordinator
P.O. Box 119
Nursery, TX 77976
(361) 485-6134
Map Sheet Links
- Map sheet 1 (PDF, Map 10MB)
- Map sheet 2 (PDF, Map, 10.5MB)
- Map sheet 3 (PDF, Map, 11.2MB)
- Map sheet 4 (PDF, Map, 11.3MB)
- Map sheet 5 (PDF, Map, 11.1MB)
- Map sheet 6 (PDF, Map, 11.3MB)
- Map sheet 7 (PDF, Map, 12.2MB)
- Map sheet 8 (PDF, Map, 12.1MB)
- Map sheet 9 (PDF, Map, 12.4MB)
- Map sheet 10 (PDF, Map, 10.3MB)
- Map sheet 11 (PDF, Map, 10.4MB)
- Map sheet 12 (PDF, Map, 9.6MB)
- Map sheet 13 (PDF, Map, 12.6MB)
- Map sheet 14 (PDF, Map, 9.2MB)
- Map sheet 15 (PDF, Map, 10.1MB)
- Map sheet 16 (PDF, Map, 10.8MB)
- Map sheet 17 (PDF, Map, 10MB)
- Map sheet 18 (PDF, Map, 9MB)
- Map sheet 19 (PDF, Map, 9.3MB)
- Map sheet 20 (PDF, Map, 9.8MB)
- Map sheet 21 (PDF, Map, 10.1MB)
- Map sheet 22 (PDF, Map, 8.9MB)
- Map sheet 23 (PDF, Map, 9.8MB)
- Map sheet 24 (PDF, Map, 9.5MB)
- Map sheet 25 (PDF, Map, 9.4MB)
- Map sheet 26 (PDF, Map, 9.1MB)
- Map sheet 27 (PDF, Map, 9.6MB)
- Map sheet 28 (PDF, Map, 9.4MB)
- Map sheet 29 (PDF, Map, 10.1MB)
- Map sheet 30 (PDF, Map, 10.4MB)
- Map sheet 31 (PDF, Map, 10.5MB)
- Map sheet 32 (PDF, Map, 9.2MB)
- Map sheet 33 (PDF, Map, 9.7MB)
- Map sheet 34 (PDF, Map, 9.2MB)