CPS Energy’s offices, customer service centers, and call centers will be closed on Friday, April 26, 2024, in observance of the Battle of Flowers Parade. Offices will reopen on Monday, April 29 at 7:45 AM. Customers can report natural gas or electric emergencies by calling 210-353-HELP (4357) or 1-800-870-1006 anytime. Online services may be conveniently accessed through Manage My Account (MMA).
Howard Road to San Miguel Transmission Line Project
References
The Howard Road to San Miguel Transmission Line Project involves the proposed construction of approximately 50 miles of transmission infrastructure traversing parts of Atascosa and Bexar Counties. This project will be completed with collaboration between CPS Energy and South Texas Electric Cooperative (STEC). The proposed transmission line project will connect the CPS Energy Howard Road station and STEC’s San Miguel station in Christine, TX.
This project will increase the resiliency and reliability of Texas’ electric grid by adding another transmission pathway, while also adding support to the accelerating growth south of San Antonio.
You may call, write, or email:
CPS Energy
Antonio DeMendonca,
S&T Regulatory Support Project Manager
Howard to San Miguel Transmission Line Project
Mail Code RT0801
500 McCullough Ave.
San Antonio, Texas 78215
(210) 353-2018
[email protected]
STEC
Arthur H. (Holly) Gifford
Transmission Project Coordinator
P.O. Box 119
Nursery, TX 77976
(361) 485-6134